T
Tartan-terror
Just installing Thule side panels on 6.1 Ocean wind out awning,
There are two black plastic side beam holders that screw into the awning beam that winds out.
The instructions require a 3.5mm hole drilled for the self tapping screw that holds the plastic holder, however, it’s not clear precisely where to place it.
I’ve aligned it to the van end support bracket which is 3 cms in from the side and everything fits together fine.
Here’s the issue - when you wind awning back in it doesn‘t close properly so I’m assuming that the plastic holder isn’t in the right place, yet eyeballing where to move it to isn’t obvious. Anyone solved this? I’ve emailed Thule but no response yet.
There are two black plastic side beam holders that screw into the awning beam that winds out.
The instructions require a 3.5mm hole drilled for the self tapping screw that holds the plastic holder, however, it’s not clear precisely where to place it.
I’ve aligned it to the van end support bracket which is 3 cms in from the side and everything fits together fine.
Here’s the issue - when you wind awning back in it doesn‘t close properly so I’m assuming that the plastic holder isn’t in the right place, yet eyeballing where to move it to isn’t obvious. Anyone solved this? I’ve emailed Thule but no response yet.